The expected components of this 151 km, two-lane road improvement project will primarily consist of road repairs and upgrading throughout most of the road-s length, with major reconstruction and widening through the towns of Bilin, Kyaikto, and Payagyi, including a possible grade-separated interchange with NR1 at Payagyi.
History
Local BOT company is undertaking that road section to be 10.97- 14.63m width according to the existing road alignment. It needs to implement bypass roads such as Thaton, Kyaikto, Kyaikkaw, Theinsait and repair geometric design in some place for transport facilitation.