Tazama Pipeline Upgrade

pipelineOil

Distance

1,710 km
new
– km
rehabilitated
1710km
existing
– km

Cost

$400m
$400,000,000

planned

2027

Capacity

1b
Litres Oil Day

Objective

With the loan, Sunyama says that the company will be able to upgrade the entire pipeline to a diameter of 12 inches and consequently this would increase the capacity of the pipeline to approximately 1.1 billion liters a day. (Source: https://furtherafrica.com/2020/05/28/tazama-pipelines-seeks-loan-to-upgrade-tanzania-zambia-crude-oil-pipeline/)

Description

The Tazama pipeline connects the Tanzania International Petroleum Reserves Limited (TIPER) in Dar es Salaam to the Indeni refinery in Ndola, Zambia. The pipeline is designed to carry 1.1 million tonnes per year and is owned by the Tazama Pipeline Limited a company that is jointly owned by the Government of Zambia (66.7%) and Government of Tanzania (33.3%). It was built in 1968 but now requires upgrading

History

https://www.znbc.co.zm/news/zambiatanzania-consider-gas-pipeline/

Operators

Contractors

Governing authorities