The TIRP project intends to rehabilitate the meter-gauge railway from Dar es Salaam to Isaka (970km) to increase its capacity of carrying freight from 13.5 tonnes axle load to 18.5 axle load.
"
Description
The mainline of TRC comprises the Central Corridor, a meter gauge railway (MGR) connecting the port of Dar es Salaam in the east with central and western areas of the country and terminating at Kigoma on Lake Tanganyika in the west.