Renewable Energy Capacity
Phase 1: 3.5GW renewable and 1.5GW electrolyser
Phase 2: 3.5GW renewable and 1.5GW electrolyser
Hydrogen Production
Phase 1: 175,000 tonnes per annum
Phase 2: 175,000 tonnes per annum
Ammonia Output
Phase 1: 1,000,000 tonnes of ammonia per annum
Phase 2: 1,000,000 tonnes of ammonia per annum
Description
"This US$10 billion project is planned to be developed in phases, at full development targeting 350,000 metric tons of green hydrogen production a year from ~7GW of renewable generation capacity and ~3GW electrolyser.
The project once fully developed will employ an estimate 3,000 people, with 15,000 construction jobs supported over the four-year construction period"