Port of Matadi Container Terminal Upgrade

port

Cost

$100m
$100,000,000

underConstruction

2027

Description

The contract, awarded by Matadi Corridor Terminaux à Conteneurs (MCTC) company, includes the construction of a new 350 metres long by 30 metres wide pile dock located in front of the existing Docks 5, 6 and 7 along with three 20-metre-wide access bridges through the existing dock, an operations building and a workshop facility, as well as the refurbishment of the 7-hectare logistics hub.

Contractors

logo
Eiffage
Company

Governing authorities

Menu